The turn-key Project consisted of the procuremet and execution of all civil, mechanical and electrical works of the hydroelectric power plant including 2 turbines with a total capacity of 9,35 MW and 2 generators with a total capacity of 11.000 kVA.
Bolu/ Türkiye
DESIGNDESIGN: Temel - Su
CAPACITY: 42.000.000 kWh/year