The turn-key Project consisted of the engineering, procurement and execution of all civil, mechanical, electrical and instrumentation works of the wastewater treatment plant and the solid waste storage area which would be the first phase of the biological treatment system carried out within the Erzincan earthquake rehabilitation and restructuring project. The treatment was for the domestic wastes as well as the industrial wastes of the city of Erzincan.
Erzincan/ Türkiye
CAPACITY: 124.000 inhabitants