The Project consisted of the engineering, procurement and execution of all civil, mechanical and electrical and instrumentation works of the Copper Concentrator on turn-key basis. The Concentrator included a steel structured manufacturing hall with a total closed area of 90 thousand m2 and additional buildings with a total closed area of 40 thousand m2.
Main quantities are listed as 16,000 ton equipment, 3,000 ton piping, 1700 ton tank, 900 km cabling, 15,000 ton structural steel and 100,000 m3 concrete.
Bozshakol/ Kazakhstan
CAPACITY: 25.000.000 tons/year