The Project consisted of engineering, procurement, manufacturing of equipment and the execution of all civil, mechanical, electrical and instrumentation works of 2 power boilers, each with a capacity of 80 tons/hour steam at a pressure of 43 bars. Auxiliary systems such as deaerator, condensation tank, pressure reducing station, fuel heating and pumping system and water demineralization system with a capacity of 200 m3/hour were also included in the scope of the project.
Siirt/ Turkey
CAPACITY: 2x80 tons/hour steam
LICENSOR: Stein Industrie, France