The turn-key Project consists of;
- Renovation of the Electro-Mechanical Works of the existing lines.
- Electro-Mechanical Works on Batıkent-OSB subway line
- Signalling System Works of the complete network
- Renovation of the Depot, Workshop, and Control Center
- Renovation of the signalling, anouncement, wireless, etc. systems of the existing 108 cars
- Supply, installation, and operation of the on board equipment for signalling of the 324 cars to be bought in the future.
- Electro-Mechanical Works on Kızılay - Koru subway Line
- Installation of Power supply & Distrubution, Traction Power Centre, Scada and Communication Network Systems on Dutluk, Meteoroloji and AKM Stations on Tandogˆan - Kec¸io¨ren subway line.
Ankara/ Turkey
CLIENT: Ankara Metropolitan Municipality