The turn-key Project consisted of engineering, procurement and execution of all civil, mechanical, electrical and instrumentation works of the wastewater treatment plant and a spent caustic neutralisation unit. The wastewater treatment plant was built for treating the effluents of ballast water (750 m3/hour), oily wastewater containing ammonia and sulphuric acid (500 m3/hour), storm water (500 m3/hour) discharged from the refinery complex.
                        
                        İzmit/ Turkey
                    
                            
                            CAPACITY: 1.750 m3/hour
                        
